How Much Time Does it Take to Build An App?

Are you planning to build an app? Have you got any new mobile app development projects? It is a common concept that your client will ask you about the estimated time for the project completion. However, you cannot commit to the exact time.

The total time in building an application will depend on various factors. Of Course, a smaller application will take less time, and a large application will take more time. Besides that, many other factors are applicable. Let’s get deep to unlock more knowledge.

Factors affecting time to build an app

Factors Affecting the Time to Build an App:

Design and development

This is one of the crucial stages in the development process. There is a need for good coordination between front end and back end systems. So designers and coders need to work together in the app building company.

The front-end design takes the consideration of UI design, caching and wireframing. The back end considers the data storage, data integration and user management.

The app design time will vary between 2 to 3 weeks for the simple application. For the complex, there will be more requirements for more weeks.

Scope of the application:

So it is important to take the outline of the application in mobile app development.

The scope definition should include the target audience’s needs. It is also crucial to know whether any other apps in the market offer the same functionality or not.

Functions and Features:

The number of functions and features are another crucial point to build an app. A massive amount of time will be invested in the development process with growing features.

Therefore, it is crucial to think about the features. Moreover, the number of operating systems for the app availability is also crucial.

Third Party Integration:

The need for third-party integration comes into the picture when the application is interconnected to other services. It again needs extra time for the correct implementation. Usually, it takes longer than expected to evaluate the work.

Resource availability and Changes:

To build an app, there is a dedicated team for the specific project that works closely with the client. They do their work on time. However, it is not the case all the time. Time taken to hire the right talent, waiting for the other pending task, and the client’s requirements are the factors that delay the project. Ultimately, there may be a delay in the project till all things are sorted out.

Testing:

You are done with all the design work. Now the next step is the testing. It ensures that the application is free of bugs and errors. Testing is another factor that consumes time. You cannot complete the testing in a single day.

Again, the application size impacts the testing time. For the smaller version, it might take 6 weeks. The middle size and big size apps will need more time.

For Alpha Testing

For Beta Testing

What Factor Slows the App Development Project?

Usually, the app development process takes 2 to 3 months. Many factors delay the development process.

Inexperienced developers:

Good developers will be able to solve the issues and bugs fastly. Often clients or start-up companies hire inefficient developers for the big project. The ultimate result is the project slows down.

Industry wise difference:

The type of industry for which you make an application is also a factor. For instance, you can make a social media app in 1 to 2 months. However, the on-demand applications will take more time to develop.

Complex technologies:

Artificial intelligence, machine learning and VR/AR can slow down mobile app development. They make a better app but also take a big price which is app development delay.

Changes in the mid project:

There is a continuous process where all the stages are interconnected. The sudden change in the plan of the middle stage will definitely slow down the process. It also affects the performance of the app.

How to accelerate the application development time?

Cross-Platform:

People often confuse the finalization of the platform between Android and iOS. The cost and timeline of both platforms are high. However, cross-platform app development is a great solution for it. You can consider tools like Xamarin and PhoneGap for building great apps in less time.

Automated Testing:

Automated testing is a great thing you can include to reduce the time spent in development. Using this strategy, at a time you can run a whole set of tests. It helps in refining the app’s security. Several testing methods save time.

Agile Development:

App development companies follow an agile methodology. It gives a flexible and adaptable programming structure. Also, It is ideal for the open-ended communication between developers and app owners. It makes sure the app development is on time.

Final Conclusion:

There is no calculation of the exact time spent to build an app. You can only do an approximate estimation on it. However, after the final launch of the application, there is time spent on maintenance and updates. Therefore, it is a continuous process for any app development company. It is advisable to have proper planning and a roadmap for the development strategy.
Share This Story, Choose Your Platform!